{"id":2048,"date":"2026-02-04T09:43:22","date_gmt":"2026-02-04T09:43:22","guid":{"rendered":"https:\/\/stakebridgeirpr.com\/media\/?p=2048"},"modified":"2026-02-03T19:50:58","modified_gmt":"2026-02-03T19:50:58","slug":"alscon-revival-committee-power-constraint","status":"publish","type":"post","link":"https:\/\/stakebridgeirpr.com\/media\/alscon-revival-committee-power-constraint\/","title":{"rendered":"ALSCON Revival Hinges On Power, Again"},"content":{"rendered":"<p>The federal government has inaugurated an 11-member project delivery committee to revive the Aluminium Smelter Company of Nigeria (ALSCON) and return it to full operations. The committee\u2019s remit is narrowly defined around electricity supply, fast-tracking 132 kV and 330 kV transmission connections to the plant, completing stalled lines, producing technical status reports, and jointly commissioning grid infrastructure. The move is framed as a catalyst for industrial revival, power stability, and regional economic growth.<\/p>\n<p><strong>DECISION HIGHLIGHT<\/strong><br \/>\nInitiator: Federal Government of Nigeria<br \/>\nProject: ALSCON power reconnection and operational restart<br \/>\nCommittee Size: 11 members<br \/>\nInstitutions Represented: ALSCON, Niger Delta Power Holding Company, Transmission Company of Nigeria, Nigerian Electricity Regulatory Commission, Federal Ministry of Power<br \/>\nVoltage Scope: 132 kV and 330 kV transmission lines<br \/>\nPolicy Objective: Industrial restart, power stability, job creation<\/p>\n<p><strong>DECISION MEMO<\/strong><br \/>\nALSCON\u2019s revival has been announced before, with limited effect. The smelter, once positioned as a cornerstone of Nigeria\u2019s industrial ambitions, has remained largely dormant due to a familiar triad, unreliable power, contractual disputes, and policy inconsistency. The new committee acknowledges, implicitly, that electricity remains the decisive bottleneck.<\/p>\n<p>Minister of Power Adebayo Adelabu described power as the \u201ccritical enabler\u201d for continuous operation and urged inter-agency coordination to avoid delays. His remarks underline the core reality. Without stable, grid-backed electricity, ALSCON cannot operate competitively, regardless of ownership structure or sunk assets.<\/p>\n<p>The technical scope assigned to the committee is unusually granular. It includes completing the Itu\u2013Aba and Itu\u2013Calabar 132 kV lines, producing single line diagrams, determining funding requirements, and jointly commissioning both 132 kV and 330 kV connections. This suggests that previous attempts failed not at policy level, but at execution and sequencing across institutions.<\/p>\n<p>Ownership dynamics add another layer. ALSCON\u2019s majority shareholder, UC Rusal, through its representative Viacheslav Krylov, signalled readiness to collaborate. Krylov disclosed that ALSCON already has 540 MW of installed gas-fired generation capacity, designed primarily for smelting operations, with surplus power theoretically exportable to the grid. The caveat is gas supply reliability. When gas disruptions occur, the plant requires grid access as a fallback to avoid shutdowns that damage equipment and economics.<\/p>\n<p>This highlights a deeper contradiction. Nigeria is attempting to revive an energy-intensive industrial asset in a power system still struggling with transmission constraints, liquidity shortfalls, and fuel supply risks. The committee may coordinate infrastructure delivery, but it cannot, on its own, fix systemic weaknesses in the power value chain.<\/p>\n<p><strong>DATA BOX<\/strong><br \/>\nCommittee Size: 11 members<br \/>\nTransmission Scope: 132 kV and 330 kV lines<br \/>\nInstalled On-site Power Capacity: ~540 MW (gas-fired)<br \/>\nKey Lines: Itu\u2013Aba 132 kV, Itu\u2013Calabar 132 kV<br \/>\nPrimary Risk Factor: Gas supply disruption and grid reliability<\/p>\n<p><strong>WHO WINS \/ WHO LOSES<\/strong><br \/>\nWinners:<br \/>\nALSCON\u2019s owners and host communities, if stable power restores production.<br \/>\nThe power sector, if surplus generation is reliably evacuated to the grid.<\/p>\n<p>Losers:<br \/>\nPolicy credibility, if timelines slip and infrastructure remains incomplete.<br \/>\nPublic finances, if revival efforts repeat past cycles without sustained output.<\/p>\n<p><strong>POLICY SIGNALS<\/strong><br \/>\nThe committee signals a renewed willingness to coordinate across power institutions, a chronic weakness in Nigeria\u2019s industrial policy. However, it also confirms that large industrial restarts remain hostage to transmission and fuel supply realities, not investment appetite.<\/p>\n<p><strong>INVESTOR SIGNAL<\/strong><br \/>\nFor industrial and infrastructure investors, the move is cautiously constructive but not decisive. Bankability will depend on funded transmission delivery, enforceable timelines, and credible contingency planning for gas disruptions. Announcements without executed grid connections will not unlock capital.<\/p>\n<p><strong>RISK RADAR<\/strong><br \/>\nExecution risk is high. Transmission projects have historically faced right-of-way issues, funding gaps, and coordination delays. There is also systemic risk, ALSCON\u2019s viability depends on a power system still under stress. Without parallel reform in gas supply assurance and grid liquidity, revival could stall again.<\/p>\n<p>The ALSCON committee reflects intent, not resolution. Nigeria has identified the problem correctly, power. Whether this iteration finally converts coordination into electrons on the line will determine if ALSCON reopens as an industrial asset, or remains a recurring policy ambition.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The federal government has inaugurated an 11-member project delivery committee to revive the Aluminium Smelter Company of Nigeria (ALSCON) and return it to full operations. The&hellip;<\/p>\n","protected":false},"author":2,"featured_media":2052,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_lmt_disableupdate":"","_lmt_disable":"","jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[25,2,24],"tags":[1277,1278,1220,1279,388],"class_list":["post-2048","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-global-business-trade","category-economy-policy","category-energy-sustainability","tag-alscon","tag-energyinfrastructure","tag-industrialpolicy","tag-manufacturingrevival","tag-nigeriapower"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>ALSCON Revival Hinges On Power, Again - StakeBridge Media<\/title>\n<meta name=\"description\" content=\"FG\u2019s ALSCON revival committee targets 132 kV and 330 kV power links, but execution, gas supply and grid reliability remain binding risks.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/stakebridgeirpr.com\/media\/alscon-revival-committee-power-constraint\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ALSCON Revival Hinges On Power, Again - StakeBridge Media\" \/>\n<meta property=\"og:description\" content=\"FG\u2019s ALSCON revival committee targets 132 kV and 330 kV power links, but execution, gas supply and grid reliability remain binding risks.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/stakebridgeirpr.com\/media\/alscon-revival-committee-power-constraint\/\" \/>\n<meta property=\"og:site_name\" content=\"StakeBridge Media\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/web.facebook.com\/stakebridgeirpr\" \/>\n<meta property=\"article:published_time\" content=\"2026-02-04T09:43:22+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/stakebridgeirpr.com\/media\/wp-content\/uploads\/2026\/02\/ALSCON-Plant.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"501\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"StakeBridge\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@Stakebridgeirpr\" \/>\n<meta name=\"twitter:site\" content=\"@Stakebridgeirpr\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"StakeBridge\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/stakebridgeirpr.com\\\/media\\\/alscon-revival-committee-power-constraint\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/stakebridgeirpr.com\\\/media\\\/alscon-revival-committee-power-constraint\\\/\"},\"author\":{\"name\":\"StakeBridge\",\"@id\":\"https:\\\/\\\/stakebridgeirpr.com\\\/media\\\/#\\\/schema\\\/person\\\/87f9fa0c83fd22471900cbb53903aac4\"},\"headline\":\"ALSCON Revival Hinges On Power, Again\",\"datePublished\":\"2026-02-04T09:43:22+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/stakebridgeirpr.com\\\/media\\\/alscon-revival-committee-power-constraint\\\/\"},\"wordCount\":648,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/stakebridgeirpr.com\\\/media\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/stakebridgeirpr.com\\\/media\\\/alscon-revival-committee-power-constraint\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/stakebridgeirpr.com\\\/media\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/ALSCON-Plant.webp\",\"keywords\":[\"ALSCON\",\"EnergyInfrastructure\",\"IndustrialPolicy\",\"ManufacturingRevival\",\"NigeriaPower\"],\"articleSection\":[\"Business\",\"Economy\",\"Energy\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/stakebridgeirpr.com\\\/media\\\/alscon-revival-committee-power-constraint\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/stakebridgeirpr.com\\\/media\\\/alscon-revival-committee-power-constraint\\\/\",\"url\":\"https:\\\/\\\/stakebridgeirpr.com\\\/media\\\/alscon-revival-committee-power-constraint\\\/\",\"name\":\"ALSCON Revival Hinges On Power, Again - StakeBridge Media\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/stakebridgeirpr.com\\\/media\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/stakebridgeirpr.com\\\/media\\\/alscon-revival-committee-power-constraint\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/stakebridgeirpr.com\\\/media\\\/alscon-revival-committee-power-constraint\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/stakebridgeirpr.com\\\/media\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/ALSCON-Plant.webp\",\"datePublished\":\"2026-02-04T09:43:22+00:00\",\"description\":\"FG\u2019s ALSCON revival committee targets 132 kV and 330 kV power links, but execution, gas supply and grid reliability remain binding risks.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/stakebridgeirpr.com\\\/media\\\/alscon-revival-committee-power-constraint\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/stakebridgeirpr.com\\\/media\\\/alscon-revival-committee-power-constraint\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/stakebridgeirpr.com\\\/media\\\/alscon-revival-committee-power-constraint\\\/#primaryimage\",\"url\":\"https:\\\/\\\/stakebridgeirpr.com\\\/media\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/ALSCON-Plant.webp\",\"contentUrl\":\"https:\\\/\\\/stakebridgeirpr.com\\\/media\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/ALSCON-Plant.webp\",\"width\":800,\"height\":501},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/stakebridgeirpr.com\\\/media\\\/alscon-revival-committee-power-constraint\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/stakebridgeirpr.com\\\/media\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ALSCON Revival Hinges On Power, Again\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/stakebridgeirpr.com\\\/media\\\/#website\",\"url\":\"https:\\\/\\\/stakebridgeirpr.com\\\/media\\\/\",\"name\":\"StakeBridge Media\",\"description\":\"...media and insights\",\"publisher\":{\"@id\":\"https:\\\/\\\/stakebridgeirpr.com\\\/media\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/stakebridgeirpr.com\\\/media\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/stakebridgeirpr.com\\\/media\\\/#organization\",\"name\":\"StakeBridge Media\",\"url\":\"https:\\\/\\\/stakebridgeirpr.com\\\/media\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/stakebridgeirpr.com\\\/media\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/stakebridgeirpr.com\\\/media\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/StakeBridge-Media-PNG-500x.png\",\"contentUrl\":\"https:\\\/\\\/stakebridgeirpr.com\\\/media\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/StakeBridge-Media-PNG-500x.png\",\"width\":500,\"height\":95,\"caption\":\"StakeBridge Media\"},\"image\":{\"@id\":\"https:\\\/\\\/stakebridgeirpr.com\\\/media\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/web.facebook.com\\\/stakebridgeirpr\",\"https:\\\/\\\/x.com\\\/Stakebridgeirpr\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/stakebridgeirpr\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/stakebridgeirpr.com\\\/media\\\/#\\\/schema\\\/person\\\/87f9fa0c83fd22471900cbb53903aac4\",\"name\":\"StakeBridge\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ec9477737c02f64804a44dada8e03055dbe0428ef8f20ebae2ea04d5ab374178?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ec9477737c02f64804a44dada8e03055dbe0428ef8f20ebae2ea04d5ab374178?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ec9477737c02f64804a44dada8e03055dbe0428ef8f20ebae2ea04d5ab374178?s=96&d=mm&r=g\",\"caption\":\"StakeBridge\"},\"url\":\"https:\\\/\\\/stakebridgeirpr.com\\\/media\\\/author\\\/stakebridge\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"ALSCON Revival Hinges On Power, Again - StakeBridge Media","description":"FG\u2019s ALSCON revival committee targets 132 kV and 330 kV power links, but execution, gas supply and grid reliability remain binding risks.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/stakebridgeirpr.com\/media\/alscon-revival-committee-power-constraint\/","og_locale":"en_US","og_type":"article","og_title":"ALSCON Revival Hinges On Power, Again - StakeBridge Media","og_description":"FG\u2019s ALSCON revival committee targets 132 kV and 330 kV power links, but execution, gas supply and grid reliability remain binding risks.","og_url":"https:\/\/stakebridgeirpr.com\/media\/alscon-revival-committee-power-constraint\/","og_site_name":"StakeBridge Media","article_publisher":"https:\/\/web.facebook.com\/stakebridgeirpr","article_published_time":"2026-02-04T09:43:22+00:00","og_image":[{"width":800,"height":501,"url":"https:\/\/stakebridgeirpr.com\/media\/wp-content\/uploads\/2026\/02\/ALSCON-Plant.webp","type":"image\/webp"}],"author":"StakeBridge","twitter_card":"summary_large_image","twitter_creator":"@Stakebridgeirpr","twitter_site":"@Stakebridgeirpr","twitter_misc":{"Written by":"StakeBridge","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/stakebridgeirpr.com\/media\/alscon-revival-committee-power-constraint\/#article","isPartOf":{"@id":"https:\/\/stakebridgeirpr.com\/media\/alscon-revival-committee-power-constraint\/"},"author":{"name":"StakeBridge","@id":"https:\/\/stakebridgeirpr.com\/media\/#\/schema\/person\/87f9fa0c83fd22471900cbb53903aac4"},"headline":"ALSCON Revival Hinges On Power, Again","datePublished":"2026-02-04T09:43:22+00:00","mainEntityOfPage":{"@id":"https:\/\/stakebridgeirpr.com\/media\/alscon-revival-committee-power-constraint\/"},"wordCount":648,"commentCount":0,"publisher":{"@id":"https:\/\/stakebridgeirpr.com\/media\/#organization"},"image":{"@id":"https:\/\/stakebridgeirpr.com\/media\/alscon-revival-committee-power-constraint\/#primaryimage"},"thumbnailUrl":"https:\/\/stakebridgeirpr.com\/media\/wp-content\/uploads\/2026\/02\/ALSCON-Plant.webp","keywords":["ALSCON","EnergyInfrastructure","IndustrialPolicy","ManufacturingRevival","NigeriaPower"],"articleSection":["Business","Economy","Energy"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/stakebridgeirpr.com\/media\/alscon-revival-committee-power-constraint\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/stakebridgeirpr.com\/media\/alscon-revival-committee-power-constraint\/","url":"https:\/\/stakebridgeirpr.com\/media\/alscon-revival-committee-power-constraint\/","name":"ALSCON Revival Hinges On Power, Again - StakeBridge Media","isPartOf":{"@id":"https:\/\/stakebridgeirpr.com\/media\/#website"},"primaryImageOfPage":{"@id":"https:\/\/stakebridgeirpr.com\/media\/alscon-revival-committee-power-constraint\/#primaryimage"},"image":{"@id":"https:\/\/stakebridgeirpr.com\/media\/alscon-revival-committee-power-constraint\/#primaryimage"},"thumbnailUrl":"https:\/\/stakebridgeirpr.com\/media\/wp-content\/uploads\/2026\/02\/ALSCON-Plant.webp","datePublished":"2026-02-04T09:43:22+00:00","description":"FG\u2019s ALSCON revival committee targets 132 kV and 330 kV power links, but execution, gas supply and grid reliability remain binding risks.","breadcrumb":{"@id":"https:\/\/stakebridgeirpr.com\/media\/alscon-revival-committee-power-constraint\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/stakebridgeirpr.com\/media\/alscon-revival-committee-power-constraint\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/stakebridgeirpr.com\/media\/alscon-revival-committee-power-constraint\/#primaryimage","url":"https:\/\/stakebridgeirpr.com\/media\/wp-content\/uploads\/2026\/02\/ALSCON-Plant.webp","contentUrl":"https:\/\/stakebridgeirpr.com\/media\/wp-content\/uploads\/2026\/02\/ALSCON-Plant.webp","width":800,"height":501},{"@type":"BreadcrumbList","@id":"https:\/\/stakebridgeirpr.com\/media\/alscon-revival-committee-power-constraint\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/stakebridgeirpr.com\/media\/"},{"@type":"ListItem","position":2,"name":"ALSCON Revival Hinges On Power, Again"}]},{"@type":"WebSite","@id":"https:\/\/stakebridgeirpr.com\/media\/#website","url":"https:\/\/stakebridgeirpr.com\/media\/","name":"StakeBridge Media","description":"...media and insights","publisher":{"@id":"https:\/\/stakebridgeirpr.com\/media\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/stakebridgeirpr.com\/media\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/stakebridgeirpr.com\/media\/#organization","name":"StakeBridge Media","url":"https:\/\/stakebridgeirpr.com\/media\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/stakebridgeirpr.com\/media\/#\/schema\/logo\/image\/","url":"https:\/\/stakebridgeirpr.com\/media\/wp-content\/uploads\/2025\/09\/StakeBridge-Media-PNG-500x.png","contentUrl":"https:\/\/stakebridgeirpr.com\/media\/wp-content\/uploads\/2025\/09\/StakeBridge-Media-PNG-500x.png","width":500,"height":95,"caption":"StakeBridge Media"},"image":{"@id":"https:\/\/stakebridgeirpr.com\/media\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/web.facebook.com\/stakebridgeirpr","https:\/\/x.com\/Stakebridgeirpr","https:\/\/www.linkedin.com\/company\/stakebridgeirpr"]},{"@type":"Person","@id":"https:\/\/stakebridgeirpr.com\/media\/#\/schema\/person\/87f9fa0c83fd22471900cbb53903aac4","name":"StakeBridge","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/ec9477737c02f64804a44dada8e03055dbe0428ef8f20ebae2ea04d5ab374178?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/ec9477737c02f64804a44dada8e03055dbe0428ef8f20ebae2ea04d5ab374178?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ec9477737c02f64804a44dada8e03055dbe0428ef8f20ebae2ea04d5ab374178?s=96&d=mm&r=g","caption":"StakeBridge"},"url":"https:\/\/stakebridgeirpr.com\/media\/author\/stakebridge\/"}]}},"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/stakebridgeirpr.com\/media\/wp-content\/uploads\/2026\/02\/ALSCON-Plant.webp","jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"jetpack-related-posts":[],"_links":{"self":[{"href":"https:\/\/stakebridgeirpr.com\/media\/wp-json\/wp\/v2\/posts\/2048","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stakebridgeirpr.com\/media\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stakebridgeirpr.com\/media\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stakebridgeirpr.com\/media\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stakebridgeirpr.com\/media\/wp-json\/wp\/v2\/comments?post=2048"}],"version-history":[{"count":1,"href":"https:\/\/stakebridgeirpr.com\/media\/wp-json\/wp\/v2\/posts\/2048\/revisions"}],"predecessor-version":[{"id":2053,"href":"https:\/\/stakebridgeirpr.com\/media\/wp-json\/wp\/v2\/posts\/2048\/revisions\/2053"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stakebridgeirpr.com\/media\/wp-json\/wp\/v2\/media\/2052"}],"wp:attachment":[{"href":"https:\/\/stakebridgeirpr.com\/media\/wp-json\/wp\/v2\/media?parent=2048"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stakebridgeirpr.com\/media\/wp-json\/wp\/v2\/categories?post=2048"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stakebridgeirpr.com\/media\/wp-json\/wp\/v2\/tags?post=2048"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}